time starting to get short, no pictures today, but have built 2 additional buildings so i think i now have enough :)
more pictures over the weekend
My general rubbish talking about war-games, miniatures and other such stuff :)
Wednesday, 31 March 2010
Saturday, 27 March 2010
27 Days to go - River Based
I managed to get the airbrush and compressor out today so i have undercoated and basecoated the river
this is how it started
the river was formed with newspaper and PVA ala papermache
i first gave the whole river a rough brown undercoat
followed by a camo green one
I then went over the whole river with a weak black wash, to get all the areas the spray didn't get
now just got to apply the water effect which i think i will colour with a hint of blue, which i'm hoping will give a river type effect.
this is how it started
the river was formed with newspaper and PVA ala papermache
i first gave the whole river a rough brown undercoat
followed by a camo green one
I then went over the whole river with a weak black wash, to get all the areas the spray didn't get
now just got to apply the water effect which i think i will colour with a hint of blue, which i'm hoping will give a river type effect.
Labels:
Demo Board,
Malifaux
27 Days to go - Church Painting (well kinda)
this is a first coat on the church, going for a white wash effect on the timber and slate type roofing
Labels:
Demo Board,
Malifaux
27 Days to go - little updates
havn't had much time over the last few days to do much so heres couple of little updates
some specifics are posted above but this is the current look of the board
some specifics are posted above but this is the current look of the board
Labels:
Demo Board,
Malifaux
Saturday, 20 March 2010
34 Days to go - Church
So this is what i actually did today, i'm fairly happy with this but would really appreciate comments :)
< general view of the church
< general view of the church
side view, when i get a chance i'll add some windows >>
<< read of the church showing cross detail >>
Labels:
Demo Board,
Malifaux
34 days to go - board
This was actually last nights work but still :)
i've built up the river, built the 2 bridges, installed the stairs to the graveyard although i'm not happy with them
everything is built out of balsa
Like i said just a little update :)
i've built up the river, built the 2 bridges, installed the stairs to the graveyard although i'm not happy with them
everything is built out of balsa
Like i said just a little update :)
Labels:
Demo Board,
Malifaux
Thursday, 18 March 2010
36 Days to go - Balsa Arrived
whooo hooo balsa arrived today, meaning i can get on with building bridges fences and cladding the buildings.
unfortunately some items are on back order, so i'm going to run down to hobby craft and purchase some EXPENSIVE balsa until the other stuff turns up
Labels:
Demo Board,
Malifaux
Saturday, 13 March 2010
41 Days to go
Having given up trying to find styrofoam this morning i went and collected an 8 x 4 sheet of celotex so that i can start building the board.
Board laid out ready to start, give me strength :$
I started by stripping off the silver foil, which was easier said then done, once taken off the board warped ever so slightly
you really need to strip all the foil off other wise it really warps, with all foil off its fine.
Foil being peeled off
I then marked up the 6" squares to aid transfering the layout i put together
Added the river for reference, after marking it out i cut the board down the the middle of the river to help cut it out
Before cutting out the river i cut and marked up the level 1 hill that also has the the river / waterfall
Cut out the river, tried to use a hot wire cutter but as celotex is fire retardant this wasn't happening
started apply no more nails to stick the foam to the board
this shows the whole of the back hill with levels one, two and three in place
made up the graveyead/front hill, both to levels 1 and 2, the left hand side is going to be a rockfall of types directly in to the river.
Mock up on the board so far
Board laid out ready to start, give me strength :$
I started by stripping off the silver foil, which was easier said then done, once taken off the board warped ever so slightly
you really need to strip all the foil off other wise it really warps, with all foil off its fine.
Foil being peeled off
I then marked up the 6" squares to aid transfering the layout i put together
Added the river for reference, after marking it out i cut the board down the the middle of the river to help cut it out
Before cutting out the river i cut and marked up the level 1 hill that also has the the river / waterfall
Cut out the river, tried to use a hot wire cutter but as celotex is fire retardant this wasn't happening
started apply no more nails to stick the foam to the board
this shows the whole of the back hill with levels one, two and three in place
made up the graveyead/front hill, both to levels 1 and 2, the left hand side is going to be a rockfall of types directly in to the river.
Mock up on the board so far
Labels:
Demo Board,
Malifaux
Thursday, 11 March 2010
WIP Church - pt1
so made a start on the church for my Malifaux board, it measures around 15.5 x 10 x 18 (at the heighest point)
the plan is to clad the building in balsa, also on the side i will add shut balsa windows of a similar style to the front.
i'm aslo considering building a raised base for the chuch out of balsa, with stairs and a bannister at the front.
the plan is to clad the building in balsa, also on the side i will add shut balsa windows of a similar style to the front.
i'm aslo considering building a raised base for the chuch out of balsa, with stairs and a bannister at the front.
Labels:
Demo Board,
Malifaux
Mock up
Ok so i thought i'd mock up the design before i started building it, good thing i did, 1 thing is for sure the saloon is almost certainly out. it simply doesn't fit.
general veiw
layout doesn't look so bad from here
Overhead
but from here you can clearly see the saloon which should be opposit the 2 black buildings, won't fit.
if you look at the previous post i had 4 building along the right hand side, it appears to only fit 3, so i think i might put in another small building and a hanging platform instead.
p.s. the smaller black buildings are outhouses but i ran out of buildings to mock up with :)
general veiw
layout doesn't look so bad from here
Overhead
but from here you can clearly see the saloon which should be opposit the 2 black buildings, won't fit.
if you look at the previous post i had 4 building along the right hand side, it appears to only fit 3, so i think i might put in another small building and a hanging platform instead.
p.s. the smaller black buildings are outhouses but i ran out of buildings to mock up with :)
Labels:
Demo Board,
Malifaux
Transportation
ok so had a thought, how in the earth am i going to transport this thing, without causing huge problems.
my first though was to have it in 2 halves, that fit into a shell so you can sling it over your shoulder (it is for demos after all), problem is if you look at the proposed layout, quite alot of scenery elements cross the half way line, no matter which way you orientate it.
hmmm, dilemma in the making
Labels:
Demo Board,
Malifaux
Materials - Styrofoam
Ok so after searching hi and low for styrofoam in the UK only to find the supplier will sell me 24 sheets minimum, I've settled on using this , it appears to be about the right stuff so we'll see
going to pick up a 2400x1200 sheet tonight. wish me luck
Labels:
Demo Board,
Malifaux
Tuesday, 9 March 2010
1st Draft
this was the first draft, some issues were the bridge was going from level 2 (or 1) to 0 which would of been an issue, but apart from that its a pretty simple layout
Labels:
Demo Board,
Malifaux
2nd Draft with some colour
this is the same image but with some colour applied so that you can see the areas a little (very little) more clearly
Labels:
Demo Board,
Malifaux
2nd Draft
This is my general idea of the board layout
its got a lot for a 3 x 3 board, river, roads/paths, couple of buildings, water pump, mine shaft,hills and a grave yard.
Labels:
Demo Board,
Malifaux
Malifaux Demo Board
ok, so the plan is to build a Mailfaux Demo Board in time for salute 2010, which is about 45days away and being as its taking me 10 months to semi paint my Rasputina boxset i bought last year at salute its going to be tight.
the board will be a 3' x 3' board constructed of MDF and Styrofoam
more details to follow
Labels:
Demo Board,
Malifaux
1st Post
opened my first blog not sure why, but here we go
Subscribe to:
Posts (Atom)